Dug and installed new drainage system including stormwater with each house having a rain water tank and working off a rain bank system
Installed new hot and cold water supply lines to each house which consist of 3 bathrooms a kitchen and laundry plus garden taps as requested by the architect
Installed new gas line to bayonet points and 2 instantaneous heaters per house